Preparation of plan for operation in case of fire
90.00€
Plan for action in case of fire tAgab the safety of people and prevents property damage, and it describes how to conduct a safe evacuation. The extra security is provided by knowing where the fire safety installations are located and how they work.
The purpose of the plan to act in the event of a fire is to ensure the safety of people and prevent property damage in the event of a fire and it describes how the persons responsible can carry out a secure evacuation. The plan must be prepared in an enterprise or agency which has the obligation to submit a fire safety report for self-inspection and to carry out a fire safety inspection. The possessor of the construction works is responsible for the preparation of the plan.
The plan consists of an action plan and schemes for evacuation and operation in the event of fire and is the basis for the theory part of the exercise in operation in the event of fire.
In case of questions and problems, our fire safety specialists and experts will provide advice.
The price of the service includes 1 hour consultation and further activity is mapped and priced according to the actual work volume.
Why order a fire safety specialist or expert to operate a plan in the event of a fire?
Flameguard specialists have extensive knowledge and experience in the field of fire safety. Legislation and good practice are always changing, and without experience, the text of plans is worth nothing unless it is properly implemented or the risks properly assessed. We take into account the specificities of each company and the environment that can affect how we operate in the event of a fire.
We also have experience in drawing up plans to operate in the event of fire in buildings located abroad and in coaching employees. We help find solutions and prevent problematic situations in the film industry, concerts, hikes, tourist trips, ships/yachts.


Receipt from Output point
The receipt of goods from the store is free of charge. We are expected to complete the order within 1-5 days, except for products on order.
The delivery of goods shall be made to the Contracting Authority or to a person authorised by the Contracting Authority. Additional information on the phone +37258212121 or shop@flameguard.ee.
Delivery of parcel trucks
The ability and charge to send a parcel machine depends on the conditions of the parcel machine service provider.
If the purchased product cannot be transported through the parcel machine network, Flameguard may change the service provider and in this case the transport price may also change.
Delivery by courier
The ability and reward to send by courier depends on the terms and conditions of the service provider. In general, we work with all express delivery companies and, if the purchased product cannot be transported through a specific express delivery service, Flameguard may change the express delivery service provider and in this case the transport price may also change.
Time-critical or time-sensitive transport
The possibility of time-critical or time-sensitive transportation depends on the location of the delivery and the exact terms and conditions of the service must be agreed in advance.
You can check the availability of the service on your phone +37258212121 or shop@flameguard.ee
Select delivery mode to subscribe to the service - Receipt from the dispatch point - Suur-Mämäe 31, Tallinn 11415
In addition, the cell in the contacts field must be filled in obligatorily Notes about order, to which the following must be added:
- Reference of the mode of delivery agreed with the flameguard;
- date and time of delivery;
- name and mobile phone number of the person receiving the goods.
OKAY! Without further information, the transport order will not be activated and the order will be stored at the delivery point of Suur-Mõjamäe 31, Tallinn
Related products
Fire safety inspection
- in an office building with a surface area exceeding 750 m2
- industrial and storage buildings with an area exceeding 1000 m2
- garage with a surface area exceeding 1000 m2
Drawing up technical drawings
We are drawing up schematic plans for evacuation, notification boards and other construction engineering drawings. Labels used in schemes meet industry standards or meet customer needs. Diagrams can be printed on different materials and, if necessary, we use at least one common foreign language on the diagrams.
In addition, we also offer changes to drawings in digital. DWG files.
Fire safety audit
Ventilation maintenance
- at least once a quarter if the equipment is used 12 h/day –16 h/day;
- at least once a half-yearly period if the equipment is used 6 h/day –12 h/day;
- at least once a year if the equipment is used 2 h/day -6 h/day.
Chimney sweeper service
Approval of safety report
Approval of emergency plan
Training of person responsible for fire safety

Join our newsletter!
We send sector-specific information about the services and e-store by e-mail at 1 monthly frequency.